How to read this tracker
A filing is not an approval. A filing is a document placed on the record, and an approval is a decision by the body that has the authority to make it.
An approval is not a construction start. A vote and a groundbreaking are different events, so look for the source that names the step you care about. For public works, a budget line is not a construction start either, and a planned start in a developer release is a projection.
Dates matter. When two sources give different figures or dates for the same project, this page shows both with the name of each publisher instead of choosing one. Status for the Magnolia and Palm/Goldenwest entries comes from developer pages and CEQAnet listings, and each entry says so.
Council and Coastal Commission actions reported
Entries where a cited source reports a council vote or a Coastal Commission action. Status comes from the developer's own pages and from the City's specific plan document, and each is attributed to its publisher.
Magnolia Coast (Magnolia Tank Farm)
Location: About 29 acres in Huntington Beach. The sources describe the site differently: the City's Magnolia Tank Farm Specific Plan says "adjacent to Magnolia Street and the D01 channel," Commercial Observer says "wedged between Magnolia Street and Pacific Coast Highway," the Shopoff release says near Magnolia Avenue and Pacific Coast Highway, and the project FAQ says between Magnolia Street and Banning Avenue. Type: Mixed-use master plan: for-sale homes, affordable apartments, hotel and retail. Size as the source words it: Shopoff release (September 18, 2024): "approximately 200+ for-sale single-family detached and attached homes, a 50-unit affordable multifamily community, and a 215-key boutique hotel with 19,000 square feet of retail." The project FAQ (2026) says a boutique apartment complex of 51 units will be available for income-qualified renters.
Status per the source (no status date stated; page checked October 13, 2026): The developer's project page lists the status as Pre-Development (page carries no date). It reports tentative map approval from the City on January 27, 2026, and the project FAQ says demolition and rough grading will start early Q2 2026. No source reviewed confirms that grading has begun.
- September 18, 2024: In its news release published on this date, Shopoff states: "The council voted 7-0 in favor of the project." The same release says: "Shopoff secured California Coastal Commission approval in July 2024." [1]
- September 30, 2024: In an article published on this date, the Orange County Business Journal wrote that the council approved the project "nearly two months after the California Coastal Commission gave its support for the development," and: "Construction is slated to begin in early 2026, with the first houses to be delivered later that year or in early 2027." [2]
- February 10, 2025: In an article published on this date, Commercial Observer wrote: "Shopoff plans to begin construction on the project, which is wedged between Magnolia Street and Pacific Coast Highway, in late 2025." [3]
- March 6, 2025: In a press release published on this date, Marcus & Millichap wrote: "The project is currently in predevelopment with construction slated to commence near the end of 2025." [4]
- December 13, 2024: The City's Magnolia Tank Farm Specific Plan (SP 18) document lists: "Certified by California Coastal Commission LCP-5-HNB-24-0003-1 (December 13, 2024)." The date shown is the date in the plan document. [7]
- No date stated on the page: Shopoff's project page (undated, 2026) states: "Shopoff received its tentative map approval from the City on January 27, 2026. Demolition and rough grading of the site will start early Q2 2026." It also states "final approval from the California Coastal Commission in December 2024." [5]
- No date stated on the page: The project FAQ (undated, 2026) repeats: "Demolition and rough grading of the site will start early Q2 2026" and says "A boutique apartment complex of 51 units will be available for income-qualified renters." [6]
Where the sources differ:
- Coastal Commission approval: the Shopoff release (September 2024) and the Orange County Business Journal place it in July 2024, while the Shopoff project page says "final approval from the California Coastal Commission in December 2024" and the City's specific plan document lists certification on December 13, 2024. This tracker shows each as stated and does not choose one.
- Affordable units: the 2024 Shopoff release and the Orange County Business Journal say 50 units, while the 2026 project FAQ says 51 units.
- Construction start: the Shopoff release (2024) and the Orange County Business Journal (September 2024) gave early 2026, while Commercial Observer (February 2025) and Marcus & Millichap (March 2025) gave late 2025, and the 2026 developer pages say demolition and rough grading start early Q2 2026. Each is a projection, not a recorded start.
Source links: Shopoff news release on City Council approval of the Magnolia Tank Farm project [1]; Shopoff to begin work on $500M HB project [2]; Commercial Observer, financing report on the Magnolia project [3]; Marcus & Millichap press release on the Magnolia financing [4]; Magnolia Coast developer project page [5]; Magnolia Coast project site FAQ [6]; Magnolia Tank Farm Specific Plan, Volume I [7]
Filed notices, environmental review and City project records
Entries built around a filing on the State of California CEQAnet site or a City project page. A filing is a document on the record, not a decision.
Redondo Circle Industrial Project
Location: 7600 Redondo Circle, Huntington Beach (cross streets Redondo Circle and Talbert Avenue, per CEQAnet). Type: Industrial warehouse buildings. Size as the source words it: CEQAnet: "two warehouse buildings for a total of 185,912 sf" on an approximately 9.59-acre site that the filing says is currently developed with an operating lumber yard.
Status (source dated May 1, 2026): CEQAnet lists a Notice of Determination posted March 6, 2026, and a later appeal of the Zoning Administrator's approval posted May 1, 2026. No later outcome of the appeal was found in the sources reviewed.
- March 6, 2026: CEQAnet posted a Notice of Determination for the Redondo Circle Industrial Project with the City of Huntington Beach as lead agency; the page lists "Approved On 3/4/2026." The description reads: "two warehouse buildings for a total of 185,912 sf." [8]
- May 1, 2026: CEQAnet posted: "Appeal of the Zoning Administrator's approval of Conditional Use Permit No. 24-011/Mitigated Negative Declaration No. 24-002 (Redondo Circle Industrial Project)." [9]
Source links: Redondo Circle Industrial Project, Notice of Determination [8]; Redondo Circle Industrial Project, appeal notice [9]
Bolsa Chica Senior Living Community
Location: About 3.10 acres at Bolsa Chica Street and Warner Avenue, Huntington Beach (CEQAnet). Type: State-licensed senior living community replacing existing commercial buildings. Size as the source words it: Draft EIR version on CEQAnet: "four-story, 200,000-square-foot State-licensed senior living community" with 159 total living units (25 memory care and 134 assisted living). The 2022 notice described five stories, 298,000 square feet and 213 units.
Status (source dated June 19, 2024): CEQAnet lists a Draft EIR received June 19, 2024. No later project decision was found in the sources reviewed.
- November 2, 2022: CEQAnet lists a Notice of Preparation of an EIR describing a "five-story, 298,000-square-foot State-licensed senior living community consisting of 213 total living units." [10]
- 2023: A City Planning Commission staff report (2023, an earlier 202-unit version) lists a Conditional Use Permit request "To demolish 50,000 sq. ft. of existing commercial space." [12]
- June 19, 2024: CEQAnet lists a Draft EIR received June 19, 2024, describing a "four-story, 200,000-square-foot State-licensed senior living community" with 159 total living units. [11]
Source links: Bolsa Chica Senior Living Community, Notice of Preparation [10]; Bolsa Chica Senior Living Community, Draft EIR listing [11]; Planning Commission staff report, senior living community (2023) [12]
Bella Terra Residential (7777 Edinger Avenue)
Location: 7777 Edinger Avenue, north side of Edinger Avenue west of Beach Boulevard, on the Bella Terra site. Type: Seven-story mixed-use project: apartments with ground-floor retail. Size as the source words it: City project page: "300 residential apartment units" and "approximately 25,000 sq. ft. of new ground floor retail space" in a new 7-story mixed-use project, with demolition of the existing 149,001 sq. ft. Burlington Coat Factory and an adjacent 33,331 sq. ft. retail building.
Status (source dated May 14, 2025): The City's project page lists "Project Status: Plan Check" and "Last Updated: May 14, 2025." No demolition permit or construction start was found in the sources reviewed.
- May 14, 2025: The City's project page, last updated May 14, 2025, lists the applicant as DJM Capital Partners and states: "Project Status: Plan Check." [13]
Source links: Bella Terra Residential project page [13]
Palm/Goldenwest Specific Plan Amendment
Location: 92 acres along Pacific Coast Highway between Goldenwest Street and Seapoint Street, Huntington Beach. Type: Specific plan amendment: residential, visitor-serving commercial and open space. Size as the source words it: CEQAnet Notice of Preparation: "up to 800 residential units, up to 350 hotel rooms or other permitted visitor-serving uses." The Draft EIR listing describes Planning Area 1 as "16 acres of Commercial Visitor uses".
Status (source dated August 19, 2026): CEQAnet lists a Draft EIR received August 19, 2026 with a state review period of August 20 to October 5, 2026. The Draft EIR states that each future discretionary project would receive its own CEQA review, and that project-specific design details for future residential and commercial development are unknown at this time.
- May 5, 2025: The Orange County Business Journal reported that the applicant "owns the 92-acre property along Pacific Coast Highway between Goldenwest Street and Seapoint Street." [14]
- May 7, 2025: The Real Deal wrote: "The proposed project would require a zoning change and approvals from the California Coastal Commission and Huntington Beach City Council." [15]
- February 6, 2026: CEQAnet lists a Notice of Preparation of an EIR received February 6, 2026, with the City of Huntington Beach as lead agency, describing "the future construction of up to 800 residential units, up to 350 hotel rooms or other permitted visitor-serving uses." [16]
- August 19, 2026: CEQAnet lists a Draft EIR received August 19, 2026 and states: "Each future discretionary project facilitated by the proposed project would be subject to a project-specific CEQA review." [17]
Source links: Homes, hotel proposed near Bolsa Chica [14]; Oil company proposes Bolsa Chica beach development [15]; Palm/Goldenwest Specific Plan Amendment, Notice of Preparation [16]; Palm/Goldenwest Specific Plan Amendment, Draft EIR listing [17]
Infrastructure in the works in Huntington Beach
Public works listed on City of Huntington Beach Public Works project pages and in the City's Capital Improvement Program document for fiscal year 2026-27. Each entry names who the cited page lists, then gives the amount, funding and status only as the cited page states them. The City pages and the program document print no publication date, so entries without a stated date show "No date stated" and the date this page was checked.
A budget line is not a construction start, and a contract award is not a construction start. Where a City page gives a construction window, this page repeats it as a projection. Regional projects run by the state or the county transportation authority are not listed here, because no dated project record for them was found in the sources reviewed.
Construction reported by the City
Entries where a City project page states that construction is underway.
McFadden Lift Station Project
Location: Existing sewer lift station near South Greer Park. Type: Sewer lift station replacement.
Listed by: City of Huntington Beach Public Works.
Status (source dated July 14, 2026): The City project page lists "Construction Underway - July 14, 2026" and "Construction to End (subject to change) - Spring 2027".
- March 17, 2026: The City page lists: "City Council Approval - March 17, 2026." [18]
- July 14, 2026: The City page lists: "Construction Underway - July 14, 2026, Construction to End (subject to change) - Spring 2027." The page carries no publication date; checked 2026-10-13. [18]
- No date stated on the page: The City page describes the scope: "The City will replace and upgrade the existing sewer lift station near South Greer Park." [18]
Source links: McFadden Lift Station project page [18]
Council approval or contract award
Entries where the City page states a Council approval or a contract award. An award is not a construction start, and the construction dates on these pages are projections.
Bolsa Avenue Rehabilitation Project
Location: Bolsa Avenue from Bolsa Chica Street to Goldenwest Street. Type: Arterial street rehabilitation.
Listed by: City of Huntington Beach Public Works.
Status (source dated July 7, 2026): The City page lists the project as awarded July 7, 2026. It lists construction beginning September 10, 2026* and completion Spring 2027*, which are dates on the page, and this tracker found no source stating that construction has begun.
- July 7, 2026: The City page lists: "Project Awarded: July 7, 2026 - Completed, Construction Begins - September 10, 2026*, Construction Completion - Spring 2027*." The page carries no publication date; checked 2026-10-13. [19]
- No date stated on the page: The City page states: "The project segment for the Arterial Street Improvement is Bolsa Avenue from Bolsa Chica Street to Goldenwest Street." [19]
Source links: Bolsa Avenue Rehabilitation project page [19]
Humboldt Drive Bridge Rehabilitation Project
Location: Humboldt Drive Bridge (the source page names no cross street). Type: Bridge rehabilitation and water main replacement.
Listed by: City of Huntington Beach Public Works.
Status (source dated June 16, 2026): The City page lists City Council approval on June 16, 2026 and a construction window beginning November 2026*, which is a projection on the page, not a recorded start.
- June 16, 2026: The City page lists: "City Council Approval - June 16, 2026." [20]
- No date stated on the page: The City page lists: "Construction Begins - November 2026*, Construction Completion - Winter 2027*." The page carries no publication date; checked 2026-10-13. [20]
- No date stated on the page: Scope as the City page words it: "removal, widening, and full reconstruction of the bridge deck, sidewalks, barrier walls, handrails, structural girders." [20]
Source links: Humboldt Drive Bridge project page [20]
Capital Improvement Program lines and funding stage
Entries listed in the City's Capital Improvement Program or in a City project summary. A program line is not a construction start, and a fiscal year shown is the City's own schedule.
Arterial Rehabilitation (Yorktown, Delaware, 17th Street, Palm Avenue)
Location: Yorktown Avenue (Bushard St - Brookhurst St), Delaware Street (Adams Ave - Atlanta Ave), 17th Street (Palm Ave - PCH), Palm Avenue (Goldenwest St - 17th St). Type: Arterial street paving.
Listed by: Public Works (the CIP's "Funding Department"). Amount as stated: $6,000,000 FY 2026-27 appropriation ($30,000,000 five-year total). Funding as stated: RMRA $5,500,000 and Prop 42 $500,000 for FY 2026-27.
Status per the source (no status date stated; page checked October 13, 2026): Listed in the FY 2026-27 Capital Improvement Program with "Design Complete: FY 2026/27" and "Construction Complete: FY 2027/28". The CIP document prints no date; checked 2026-10-13..
- No date stated on the page: The CIP states: "This project will pave four arterial segments." and lists "Design Complete: FY 2026/27 Additional annual cost: $0 Construction Complete: FY 2027/28." [21]
Source links: Capital Improvement Program, fiscal year 2026-27 [21]
Garfield Avenue and Goldenwest Street Improvements
Location: Garfield Avenue (Seapoint Street - Delaware Street) and Goldenwest Street (Garfield Avenue - PCH). Type: Complete street improvements.
Listed by: Public Works (the CIP's "Funding Department"). Amount as stated: $6,254,600 total ($661,000 design FY 2026-27; $5,593,600 construction FY 2028-29).
Status per the source (no status date stated; page checked October 13, 2026): Listed in the FY 2026-27 Capital Improvement Program with "Design Complete: FY 2027/28" and "Construction Complete: FY 2028/29". The CIP document prints no date; checked 2026-10-13..
- No date stated on the page: The CIP states that Garfield Avenue (Seapoint Street - Delaware Street) and Goldenwest Street (Garfield Avenue - PCH) "will have complete street improvements" and lists "Design Complete: FY 2027/28 Additional annual cost: $0 Construction Complete: FY 2028/29." [21]
Source links: Capital Improvement Program, fiscal year 2026-27 [21]
Atlanta Avenue / First Street Fiber Optic
Location: Atlanta Avenue from 1st Street to Magnolia and First Street to Lifeguard Headquarters. Type: Fiber optic conduit and cable.
Listed by: Public Works (the CIP's "Funding Department"). Amount as stated: $105,000 FY 2026-27 appropriation.
Status per the source (no status date stated; page checked October 13, 2026): Listed in the FY 2026-27 Capital Improvement Program. The CIP document prints no date; checked 2026-10-13..
- No date stated on the page: The CIP states: "Install fiber optic conduit and cable along Atlanta Avenue from 1st Street to Magnolia and along First St to Lifeguard Headquarters," for "redundant communications between the City’s Beach Operations located at Lifeguard Headquarters and City Hall." [21]
Source links: Capital Improvement Program, fiscal year 2026-27 [21]
High Pedestrian Traffic Bollard Protection Areas (Main Street, downtown and beachfront)
Location: Downtown and beach front, along Main Street. Type: Vehicle barrier bollards for street closure events.
Listed by: Police (the CIP's "Funding Department"). Amount as stated: $1,659,500 five-year total ($1,156,000 FY 2026-27). Funding as stated: Infr Fund (314).
Status per the source (no status date stated; page checked October 13, 2026): Listed in the FY 2026-27 Capital Improvement Program with "Construction Complete: FY 2027/28". The CIP document prints no date; checked 2026-10-13..
- No date stated on the page: The CIP states: "Furnish and Install bollards in downtown and beach front to provide vehicle barrier during street closure events along Main Street." [21]
Source links: Capital Improvement Program, fiscal year 2026-27 [21]
Central Library Switchgear Replacement
Location: Central Library. Type: Public building electrical switchgear.
Listed by: Public Works (the CIP's "Funding Department"). Amount as stated: $1,040,000 FY 2026-27. Funding as stated: Infr Fund (314).
Status per the source (no status date stated; page checked October 13, 2026): Listed in the FY 2026-27 Capital Improvement Program. The CIP document prints no date; checked 2026-10-13..
- No date stated on the page: The CIP states: "Install new electrical switchgear and transformers at Central Library." and "Central Library is currently using rental electrical switchgear equipment costing $19,000 per month." [21]
Source links: Capital Improvement Program, fiscal year 2026-27 [21]
Warner Fire Station Design (replacement)
Location: Warner Fire Station. Type: Fire station replacement, design funding.
Listed by: Fire (the CIP's "Funding Department"). Amount as stated: $400,000 FY 2026-27 (the CIP cost table also lists $11,500,000 in FY 2027-28).
Status per the source (no status date stated; page checked October 13, 2026): Listed in the FY 2026-27 Capital Improvement Program as a design funding request. The CIP document prints no date; checked 2026-10-13..
- No date stated on the page: The CIP states: "Requesting design funding for the replacement of Warner Fire Station," "adding Marine Safety office and living space to support current and future operational needs." [21]
Source links: Capital Improvement Program, fiscal year 2026-27 [21]
Storm Channel C6-SC1 Repair Project (Phase 2)
Location: City-owned Channel C6-SC1, from Slater to Warner Avenue. Type: Storm drain channel repair.
Listed by: Public Works (the CIP's "Funding Department"). Amount as stated: $600,000 FY 2026-27 ($2,400,000 total in the CIP cost table); the CIP description separately states a total estimated construction cost of $3.8 million in 2024.
Status per the source (no status date stated; page checked October 13, 2026): Listed in the FY 2026-27 Capital Improvement Program as Phase 2. The CIP document prints no date; checked 2026-10-13..
- No date stated on the page: The CIP states: "Several sections of City-owned Channel C6-SC1, from Slater to Warner Avenue, are cracking and failing." [21]
Source links: Capital Improvement Program, fiscal year 2026-27 [21]
Huntington Harbour Dock Demolition and Replacement
Location: City-owned dock at Huntington Harbour. Type: Harbor dock replacement.
Listed by: Public Works (the CIP's "Funding Department"). Amount as stated: $400,000 FY 2026-27. Funding as stated: Infr Fund (314).
Status per the source (no status date stated; page checked October 13, 2026): Listed in the FY 2026-27 Capital Improvement Program. The CIP document prints no date; checked 2026-10-13..
- No date stated on the page: The CIP states: "Demolish and replace the existing City-owned dock at Huntington Harbour with a new floating concrete dock system." [21]
Source links: Capital Improvement Program, fiscal year 2026-27 [21]
Bolsa Chica Street / Valley View Street Regional Traffic Signal Synchronization Project (CC-1622)
Location: Bolsa Chica Street / Valley View Street corridor, 22 intersections from Garden Grove to Huntington Beach; only the Huntington Beach portion is recorded. Type: Traffic signal synchronization and fiber optic.
Lead agency: City of Huntington Beach, with an OCTA grant. Amount as stated: $760,103 for work within Huntington Beach (corridor total $2,243,900). Funding as stated: OCTA grant $1,735,949 (corridor); City matching funds $155,533.
Status per the source (no status date stated; page checked October 13, 2026): A City Major Projects PDF gives costs and funding. The PDF prints no date; the City web server listed its last-modified date as April 5, 2024 (an HTTP header, not text in the PDF). The PDF states no construction status, and no newer status was found in the sources reviewed.
- No date stated on the page: The City PDF states: "The City of Huntington Beach is Lead Agency," "WORK WITHIN HUNTINGTON BEACH: $760,103," "TOTAL PROJECT COST: $2,243,900" and "OCTA Grant: $1,735,949." It also lists the action "Amend the 2022/2023 CIP to include this project." [22]
Source links: Bolsa Chica / Valley View traffic signal synchronization summary [22]
City plans: the General Plan, specific plans, coastal program and housing element
The plans below come from City of Huntington Beach pages and plan documents, with state and press items for the housing element. Dates are the dates the documents state, and each detail repeats the source's own words. Where two sources describe the same plan differently, the entry shows both.
Huntington Beach General Plan
Kind: general plan. Adoption or document date: 2017-10-02 (comprehensive update); nine elements.
Status (October 2, 2017): Comprehensive update adopted October 2, 2017; Housing, Coastal and Historic and Cultural Resources elements were not part of that update. No comprehensive update underway was found in the sources reviewed..
- The source states: "On October 2, 2017, the City Council adopted a comprehensive update to the General Plan." [23]
- The source states: "The City's General Plan consists of 9 elements listed below." [23]
- The source states: "Land Use, Circulation, Environmental Resources and Conservation, Natural and Environmental Hazards, Noise, and Public Services and Infrastructure" [23]
- The source states: "Three existing elements (Housing, Coastal, and Historic and Cultural Resources) were not included in the Update." [23]
Source links: General Plan page [23]
Downtown Specific Plan No. 5
Kind: specific plan. Area as the source states it: 336 acres, Goldenwest Street and Pacific Coast Highway along the coastline including the Pier to Beach Boulevard. Adoption or document date: 2010-01-19.
Status (March 12, 2014): Adopted by City Council January 19, 2010; certified by the Coastal Commission October 6, 2011; amended January 21, 2014 (Reso. 2014-01) and certified by the Coastal Commission March 12, 2014..
- The source states: "The Downtown Specific Plan (DTSP) encompasses a 336-acre area" [24]
- The source states: "City Council Adopted - January 19, 2010" [24]
- The source states: "Certified by the California Coastal Commission on October 6, 2011" [24]
- The source states: "Amended Jan. 21, 2014" [25]
- The source states: "CCC certified Mar. 12, 2014" [25]
- The source states: "Adopted by City Council Resolution No. 2009-61" [25]
Source links: Downtown Specific Plan update page [24]; Downtown Specific Plan No. 5 [25]
Beach and Edinger Corridors Specific Plan (SP 14)
Kind: specific plan. Area as the source states it: approximately 459 acres along the Beach Boulevard and Edinger Avenue corridors. Adoption or document date: 2010-03.
Status (May 2024): Amended May 2024 (Resolution No. 2024-22)..
- The source states: "Adopted March 2010" [26]
- The source states: "AMENDED May 2024" [26]
- The source states: "The total acreage of the Area is approximately 459 acres." [26]
- The source states: "Beach and Edinger Corridor Specific Plan Affordable Housing Overlay" [27]
Source links: Beach and Edinger Corridors Specific Plan (amended May 2024) [26]; Housing Element page [27]
Bella Terra Specific Plan (SP 13)
Kind: specific plan. Area as the source states it: 63 acres for Regional Commercial uses, per the plan's background statement. Adoption or document date: 2000-07-05.
Status (November 15, 2022): The plan cover lists adoption on July 5, 2000 (Resolution No. 2000-68), while its background section says the Crossings Specific Plan was adopted on August 7, 2007; both dates are as the document gives them. Modified November 15, 2022 (Ordinance No. 4267)..
- The source states: "Adopted July 5, 2000 - City Council Resolution No. 2000-68" [28]
- The source states: "Modified November 15, 2022 - City Council Ordinance No. 4267" [28]
- The source states: "Specific Plan was adopted on August 7, 2007 for development of 63 acres for Regional Commercial uses" [28]
- The source states: "The current proposal reduces the size of Area A by 7.315 acres (to 45.03 acres)" [28]
Source links: Bella Terra Specific Plan (SP 13) [28]
McDonnell Centre Business Park Specific Plan (SP 11)
Kind: specific plan. Area as the source states it: 307 gross acres in the northwestern portion of the City. Adoption or document date: 1997-10-06.
Status (February 21, 2006): Amendment No. 2 dated February 21, 2006 (Ordinance No. 3727) is the last amendment listed on the plan's title pages..
- The source states: "covers 307 gross acres located in the northwestern" [29]
- The source states: "Adopted - October 6, 1997 - Ordinance No. 3372" [29]
- The source states: "Amendment No. 2 - February 21, 2006 - Ordinance No. 3727" [29]
Source links: McDonnell Centre Business Park Specific Plan (SP 11) [29]
Magnolia Tank Farm Specific Plan (SP 18)
Kind: specific plan. Area as the source states it: approximately 29 acres adjacent to Magnolia Street and the D01 channel. Adoption or document date: 2021-01-19.
Status (December 13, 2024): Adopted January 19, 2021; certified by the California Coastal Commission December 13, 2024..
- The source states: "Adopted by City Council Resolution No. 2021-03 (January 19, 2021)" [7]
- The source states: "Certified by California Coastal Commission LCP-5-HNB-24-0003-1 (December 13, 2024)" [7]
- The source states: "encompasses approximately 29 acres adjacent to Magnolia Street and the D01 channel" [7]
Source links: Magnolia Tank Farm Specific Plan, Volume I [7]
Holly Seacliff Specific Plan (SP 9)
Kind: specific plan. Adoption or document date: 1992-04-20.
Status (July 5, 2022): Amended July 5, 2022 (Ordinance No. 4256)..
- The source states: "Adopted April 20, 1992 Ordinance No. 3128" [30]
- The source states: "Amended July 5, 2022 Ordinance No. 4256" [30]
Source links: Holly Seacliff Specific Plan (SP 9) [30]
Sunset Beach Specific Plan (SP 17)
Kind: specific plan. Adoption or document date: 2010-10-18.
Status (January 17, 2017): Amended January 17, 2017; the city lists it as not certified by the Coastal Commission..
- The source states: "Adopted by City Council: October 18, 2010" [31]
- The source states: "Amended by City Council: November 16, 2015 and January 17, 2017" [31]
- The source states: "Sunset Beach (SP 17) - not certified" [32]
Source links: Sunset Beach Specific Plan (SP 17) [31]; Local Coastal Program page [32]
Bolsa Chica Senior Care Community Specific Plan (SP 19)
Kind: specific plan. Adoption or document date: 2024-10-15.
Status (October 15, 2024): Adopted October 15, 2024 (Resolution No. 2024-53)..
- The source states: "Adopted by City Coucil Resolution No. 2024-53" [33]
Source links: Bolsa Chica Senior Care Community Specific Plan (SP 19) [33]
Huntington Beach Local Coastal Program
Kind: local coastal program. Area as the source states it: City coastal zone, including eight specific plan areas. Adoption or document date: 1985.
Status: Certified local coastal program; Coastal Element initially certified 1985, last comprehensively updated 2001, amended through 2011..
- The source states: "The City of Huntington Beach has a certified local coastal program, which is divided into two components:" [32]
- The source states: "initially certified by the California Coastal Commission in 1985 and last comprehensively updated in 2001" [32]
- The source states: "The City's coastal zone includes eight specific plan areas, six of which have been certified by the Coastal Commission." [32]
- The source states: "As Amended through 2011" [32]
Source links: Local Coastal Program page [32]
Housing Element (6th Cycle, 2021-2029)
Kind: housing element.
Status (December 19, 2025): The Attorney General's release of December 19, 2025 says the State secured a San Diego Superior Court decision requiring the City, among other things, to adopt a housing element within 120 days; no HCD certification of the 6th cycle element found in the fetched sources..
- The source states: "the 2021-2029 Housing Element is the 6th Cycle Update" [27]
- The source states: "Public Hearing Notice for June 2, 2026 City Council Meeting" [27]
- The source states: "Housing Element (2020)" [23]
- The source states: "HCD certified the amended housing element on March 24" [34]
- The source states: "requiring the City of Huntington Beach to, among other things, adopt a housing element within 120 days" [35]
Source links: Housing Element page [27]; General Plan page [23]; State housing department release on the amended housing element (2020) [34]; Attorney General release on the housing element court order [35]
Capital Improvement Program FY 2026-27
Kind: capital improvement program.
Status: FY 2026-27 CIP document posted on the city site; the New Appropriations table shows Total Funding Sources of $45,929,641 and the five-year CIP totals $94,682,141..
- The source states: "CAPITAL IMPROVEMENT PROGRAM FOR FISCAL YEAR 2026-2027" [21]
- The source states: "Total Funding Sources $2,295,000 $3,160,000 $1,000,000 $5,500,000 $2,700,000 $19,001,641 $8,751,000 $1,850,000 $1,287,000 $45,929,641" [21]
- The source states: "Total Funding Sources $45,929,641 $12,899,000 $12,818,500 $12,235,000 $10,800,000 $94,682,141" [21]
- The source states: "Proposed Budget 2026-2027 - Capital Improvement Program" [36]
Source links: Capital Improvement Program, fiscal year 2026-27 [21]; Budget and financial reports page [36]
What to ask about a project near your property
If you own or lease near one of these projects, a useful first question is which agency or body is responsible for the next decision, and on what date.
Ask where any public notice is posted and whether a comment period applies. Compare any zoning or specific plan change against your own parcel before you assume it applies to you.
Ask how the project could affect parking, access or street conditions on your block. Check any figure in a news report against the City or state filing it comes from.
Questions about this page can go through the contact page.
Contact Huntington Beach CREQuestions people ask
What new development is planned in Huntington Beach?
This tracker lists five private projects from filings, City pages and developer pages: Magnolia Coast, the Redondo Circle Industrial Project, the Bolsa Chica Senior Living Community, Bella Terra Residential and the Palm/Goldenwest Specific Plan Amendment. It also lists public works from City pages and the City's fiscal year 2026-27 Capital Improvement Program. Each entry carries its own source date, and a project missing from the page is not covered by the cited sources.
What is the status of Magnolia Coast, the former Magnolia Tank Farm?
Shopoff's project page lists the status as Pre-Development and reports tentative map approval from the City on January 27, 2026. The project FAQ says demolition and rough grading will start early Q2 2026, and no source reviewed confirms that grading has begun. Shopoff's September 18, 2024 release says the council voted 7-0 in favor of the project. The sources differ on the Coastal Commission approval (July 2024 in the release, December 2024 on the project page) and on the affordable units (50 in 2024 sources, 51 in the 2026 FAQ).
What is the Redondo Circle Industrial Project?
CEQAnet describes two warehouse buildings totaling 185,912 square feet on an approximately 9.59-acre site at 7600 Redondo Circle that is currently developed with a lumber yard. A Notice of Determination was posted March 6, 2026, showing an approval date of March 4, 2026, and an appeal of the Zoning Administrator's approval was posted May 1, 2026. No later outcome of the appeal was found in the sources reviewed.
What is the Palm/Goldenwest Specific Plan Amendment near Bolsa Chica?
CEQAnet lists a Palm/Goldenwest Specific Plan Amendment on 92 acres along Pacific Coast Highway between Goldenwest Street and Seapoint Street, with a Notice of Preparation received February 6, 2026 for up to 800 residential units and up to 350 hotel rooms or other permitted visitor-serving uses. A Draft EIR was received August 19, 2026, and it says each future discretionary project would receive its own CEQA review. The Draft EIR also says project-specific design details for future residential and commercial development are unknown at this time.
What is the status of the Bella Terra residential project at 7777 Edinger Avenue?
The City's project page, last updated May 14, 2025, describes a new 7-story mixed-use project with 300 residential apartment units and approximately 25,000 square feet of ground floor retail, and lists Project Status: Plan Check. No demolition permit or construction start was found in the sources reviewed, so the page's status is the latest dated record on this tracker.
What public works are in the works in Huntington Beach?
The City's project pages list the McFadden Lift Station Project as construction underway as of July 14, 2026, the Bolsa Avenue Rehabilitation Project as awarded July 7, 2026, and the Humboldt Drive Bridge Rehabilitation Project as approved by Council June 16, 2026. The fiscal year 2026-27 Capital Improvement Program lists further street, fiber, library, fire station, storm channel and harbor dock items. A program line is not a construction start, and the construction dates on the City pages are projections.
Sources
- Shopoff news release on City Council approval of the Magnolia Tank Farm project, Shopoff Realty Investments (news release), September 18, 2024. Accessed October 13, 2026.
- Shopoff to begin work on $500M HB project, Orange County Business Journal, September 30, 2024. Accessed October 13, 2026.
- Commercial Observer, financing report on the Magnolia project, Commercial Observer, February 10, 2025. Accessed October 13, 2026.
- Marcus & Millichap press release on the Magnolia financing, Marcus & Millichap (press release), March 6, 2025. Accessed October 13, 2026.
- Magnolia Coast developer project page, Shopoff Realty Investments (developer project page), page carries no publication date; checked October 13, 2026. Accessed October 13, 2026.
- Magnolia Coast project site FAQ, Magnolia Coast project site (Shopoff), page carries no publication date; checked October 13, 2026. Accessed October 13, 2026.
- Magnolia Tank Farm Specific Plan, Volume I, City of Huntington Beach (Magnolia Tank Farm Specific Plan, Volume I), December 2024. Accessed October 13, 2026.
- Redondo Circle Industrial Project, Notice of Determination, CEQAnet (State Clearinghouse), March 6, 2026. Accessed October 13, 2026.
- Redondo Circle Industrial Project, appeal notice, CEQAnet (State Clearinghouse), May 1, 2026. Accessed October 13, 2026.
- Bolsa Chica Senior Living Community, Notice of Preparation, CEQAnet (State Clearinghouse), November 2, 2022. Accessed October 13, 2026.
- Bolsa Chica Senior Living Community, Draft EIR listing, CEQAnet (State Clearinghouse), June 19, 2024. Accessed October 13, 2026.
- Planning Commission staff report, senior living community (2023), City of Huntington Beach Planning Commission staff report, 2023. Accessed October 13, 2026.
- Bella Terra Residential project page, City of Huntington Beach (project page), May 14, 2025. Accessed October 13, 2026.
- Homes, hotel proposed near Bolsa Chica, Orange County Business Journal, May 5, 2025. Accessed October 13, 2026.
- Oil company proposes Bolsa Chica beach development, The Real Deal, May 7, 2025. Accessed October 13, 2026.
- Palm/Goldenwest Specific Plan Amendment, Notice of Preparation, CEQAnet (State Clearinghouse), February 6, 2026. Accessed October 13, 2026.
- Palm/Goldenwest Specific Plan Amendment, Draft EIR listing, CEQAnet (State Clearinghouse), August 19, 2026. Accessed October 13, 2026.
- McFadden Lift Station project page, City of Huntington Beach Public Works Engineering, page carries no publication date; checked October 13, 2026. Accessed October 13, 2026.
- Bolsa Avenue Rehabilitation project page, City of Huntington Beach Public Works Engineering, page carries no publication date; checked October 13, 2026. Accessed October 13, 2026.
- Humboldt Drive Bridge project page, City of Huntington Beach Public Works Engineering, page carries no publication date; checked October 13, 2026. Accessed October 13, 2026.
- Capital Improvement Program, fiscal year 2026-27, City of Huntington Beach, Capital Improvement Program FY 2026-27, page carries no publication date; checked October 13, 2026. Accessed October 13, 2026.
- Bolsa Chica / Valley View traffic signal synchronization summary, City of Huntington Beach Public Works Engineering (Major Projects PDF), April 5, 2024. Accessed October 13, 2026.
- General Plan page, City of Huntington Beach, page carries no publication date; checked October 13, 2026. Accessed October 13, 2026.
- Downtown Specific Plan update page, City of Huntington Beach, page carries no publication date; checked October 13, 2026. Accessed October 13, 2026.
- Downtown Specific Plan No. 5, City of Huntington Beach, March 12, 2014. Accessed October 13, 2026.
- Beach and Edinger Corridors Specific Plan (amended May 2024), City of Huntington Beach, May 2024. Accessed October 13, 2026.
- Housing Element page, City of Huntington Beach, page carries no publication date; checked October 13, 2026. Accessed October 13, 2026.
- Bella Terra Specific Plan (SP 13), City of Huntington Beach, November 2022. Accessed October 13, 2026.
- McDonnell Centre Business Park Specific Plan (SP 11), City of Huntington Beach, February 21, 2006. Accessed October 13, 2026.
- Holly Seacliff Specific Plan (SP 9), City of Huntington Beach, July 5, 2022. Accessed October 13, 2026.
- Sunset Beach Specific Plan (SP 17), City of Huntington Beach, January 2017. Accessed October 13, 2026.
- Local Coastal Program page, City of Huntington Beach, page carries no publication date; checked October 13, 2026. Accessed October 13, 2026.
- Bolsa Chica Senior Care Community Specific Plan (SP 19), City of Huntington Beach, October 15, 2024. Accessed October 13, 2026.
- State housing department release on the amended housing element (2020), California Department of Housing and Community Development, March 2020. Accessed October 13, 2026.
- Attorney General release on the housing element court order, California Attorney General, December 19, 2025. Accessed October 13, 2026.
- Budget and financial reports page, City of Huntington Beach, page carries no publication date; checked October 13, 2026. Accessed October 13, 2026.